PA Rigging / L-Acoustics / K3
K3
Rigging field guides for the K3 line array, built from L-Acoustics' official K3 Owner's Manual (version 4.1). Each opens as an on-site checklist with a Focus mode toggle. The manual's rigging chapter documents assembly, flying, stacking, and transport preparation only — it does not document a de-rigging procedure, so no de-rig guide is included here.
1. K3 — Preparing a Block of Four K3
Building a block of four K3 enclosures on K3-CHARIOT.
2. K3 — Presetting the Inter-Enclosure Angles
Setting inter-enclosure splay angles on a K3 block before flying.
3. K3 — Flying an Array with K3-BUMP and K3-BAR
Attaching K3-BUMP and K3-BAR to a prepared block and raising the array.
4. K3 — Attaching a Block of Four K3 Under K3
Extending a flown K3 array by adding another block of four underneath.
5. K3 — Adding a Pullback with K3-RIGBAR
Rigging a K3-RIGBAR pullback off a flown K3 array.
6. K3 — Rigging a Kara II Downfill Array with KARA-DOWNK3
Connecting a Kara II downfill array to the bottom of a K3 array with KARA-DOWNK3.
7. K3 — Securing LA-RAK II AVB on LA-RAKMOUNT
Mounting LA-RAKMOUNT rails and an LA-RAK II AVB touring rack on K3-BUMP.
8. K3 — Stacking K3 on KS28 with K3-TILT
Ground-stacking K3 on a KS28 sub stack using K3-TILT and KS28-OUTRIG.
9. K3 — Attaching K2-JACK Stabilizers to K3-CHARIOT
Fitting K2-JACK stabilizers to K3-CHARIOT and raising it off its wheels.
10. K3 — Adjusting the K3-CHARIOT Site Angle
Setting a positive or negative site angle on a K2-JACK-stabilized K3-CHARIOT.
11. K3 — Stacking K3 on K3-BUMP
Ground-stacking K3 enclosures directly on K3-BUMP.
12. K3 — Stacking Multiple K3-CHARIOTLID for Transport
Stacking K3-CHARIOTLID units on K3-CHARIOT for transport.
13. K3 — Mounting K3-CHARIOTLID to K3 for Transport
Fitting K3-CHARIOTCOV and K3-CHARIOTLID to a stacked block of K3 for transport.