PA Rigging / L-Acoustics / K3 / Stacking K3 on K3-BUMP
K3 — Stacking K3 on K3-BUMP
Ground-stacking K3 enclosures directly on K3-BUMP. Reference: LA-K3-STACK-BUMP-01. Follow in order — this is a sequential rigging procedure, not an independent checklist; steps depend on the ones before them.
- Minimum 2 operators.
- Stacked K3 on K3-BUMP: safe limit 4 / maximum 6.
0/ complete
Not saved anywhere — resets when you leave this page.
Stacking on K3-BUMP
Source: L-Acoustics K3 Owner's Manual, EN, v4.1. Rigging procedures, pp.102-104.