PA Rigging / L-Acoustics / K3 / Mounting K3-CHARIOTLID to K3 for Transport
K3 — Mounting K3-CHARIOTLID to K3 for Transport
Fitting K3-CHARIOTCOV and K3-CHARIOTLID to a stacked block of K3 on K3-CHARIOT for transport. Reference: LA-K3-CHARIOTLID-MOUNT-01. Follow in order — this is a sequential rigging procedure, not an independent checklist; steps depend on the ones before them.
- Minimum 1 operator.
- K3-CHARIOTLID load capacity: up to 400 kg / 881.8 lb.
- Prerequisite: a block of four K3 is already stacked on K3-CHARIOT before starting.
0/ complete
Not saved anywhere — resets when you leave this page.
Mounting the Lid
Source: L-Acoustics K3 Owner's Manual, EN, v4.1. Rigging procedures, pp.107-109.