PA Rigging / L-Acoustics / K1
K1
Rigging field guides for the K1 line array, built from L-Acoustics' official K1 Owner's Manual (version 4.0). Each opens as an on-site checklist with a Focus mode toggle.
1. K1 — Preparing K1-BUMP
Preparing the K1-BUMP rigging bar inside K-BUMPFLIGHT before building a K1 array.
2. K1 — Securing LA-RAK II AVB on K1-BUMP
Stacking and securing up to four LA-RAK II AVB touring racks on K1-BUMP.
3. K1 — Preparing a Block of Four K1/K1-SB
Building a block of four K1 or K1-SB enclosures on K1-CHARIOT.
4. K1 — Presetting the Inter-Enclosure Angles
Setting inter-enclosure splay angles on a K1/K1-SB block before flying.
5. K1 — Flying an Array with K1-BUMP
Attaching K1-BUMP to a prepared block of four and raising the array.
6. K1 — Attaching a Block of Four K1 Under a K1 Array
Extending a flown K1 array by adding another block of four underneath.
7. K1 — Attaching a Block of Four K2 Under a K1 Element
Hanging a K2 block beneath a flown K1/K1-SB array using K2-LINK.
8. K1 — Rigging a Kara II Downfill Array with KARA-DOWNK1
Connecting a Kara II downfill array to the bottom of a K1 array with KARA-DOWNK1.
9. K1 — Flying with K1-BUMP (Caterpillar Method)
Flying a K1 array by adding enclosures one at a time straight off their K1-PLA dollies.
10. K1 — Removing an Array (Caterpillar Method / De-rigging)
Landing a flown K1 array one enclosure at a time onto individual K1-PLA dollies.
11. K1 — Rigging Check (Pre-Deployment QC)
Pre-show functional check of K1 rigging arms, pins, and the automatic locking system.