PA Rigging / L-Acoustics / K1 / Rigging Check (Pre-Deployment QC)
K1 — Rigging Check (Pre-Deployment QC)
A pre-deployment functional check of two enclosures' rigging arms, pins, and automatic locking system, run before a show to confirm the rigging hardware is sound. Reference: LA-K1-RIG-CHECK-01. Follow in order — this is a sequential check procedure, not an independent checklist; steps depend on the ones before them.
- This is a pre-deployment functional/QC test of two enclosures' rigging arms, pins, and auto-lock system — distinct from the live flying sequence.
- Run this before a show to confirm rigging hardware is sound, not as part of the actual rig.
- If the check fails at any point, immediately withdraw the product from use and contact L-Acoustics.
0/ complete
Not saved anywhere — resets when you leave this page.
Rigging Check
Source: L-Acoustics K1 Owner's Manual, EN, v4.0. Inspection and preventive maintenance, pp.57-61.