PA Rigging / L-Acoustics / K1 / Rigging Check (Pre-Deployment QC)

K1 — Rigging Check (Pre-Deployment QC)

A pre-deployment functional check of two enclosures' rigging arms, pins, and automatic locking system, run before a show to confirm the rigging hardware is sound. Reference: LA-K1-RIG-CHECK-01. Follow in order — this is a sequential check procedure, not an independent checklist; steps depend on the ones before them.

  • This is a pre-deployment functional/QC test of two enclosures' rigging arms, pins, and auto-lock system — distinct from the live flying sequence.
  • Run this before a show to confirm rigging hardware is sound, not as part of the actual rig.
  • If the check fails at any point, immediately withdraw the product from use and contact L-Acoustics.

0/ complete

Not saved anywhere — resets when you leave this page.

Rigging Check

Source: L-Acoustics K1 Owner's Manual, EN, v4.0. Inspection and preventive maintenance, pp.57-61.

What's being checked
FRONT ARM (slides) REAR ARM (rotates) AUTO-LOCK LATCH yellow visible = unlocked K1-CHARIOT

The check exercises both arm types (front slides, rear rotates) and confirms the auto-lock latch shows a yellow sticker when disengaged and none when it's actually holding the inter-enclosure angle.