PA Rigging / L-Acoustics / K1 / Preparing K1-BUMP
K1 — Preparing K1-BUMP
Preparing the K1-BUMP rigging bar inside K-BUMPFLIGHT before it is used to build and fly a K1 array. Reference: LA-K1-BUMP-PREP-01. Follow in order — this is a sequential rigging procedure, not an independent checklist; steps depend on the ones before them.
- Rigging accessories needed: K1-BUMP, 4× 22 mm shackles WLL 3.25 t, K1-DELTA (optional), K1-BPCHAIN (optional, WLL 3.15 t, required for a climbing-hoist setup).
- Minimum 2 operators.
- Systematically ensure each ball-locking pin is fully inserted by pulling on it, throughout.
- To avoid physical handling, K1-BUMP must be transported and prepared inside K-BUMPFLIGHT.
- An identification sticker at the front of K1-BUMP identifies front vs. rear.
0/ complete
Not saved anywhere — resets when you leave this page.
Preparing K1-BUMP
Source: L-Acoustics K1 Owner's Manual, EN, v4.0. Rigging procedures, pp.66-70.