PA Rigging / L-Acoustics / K1 / Rigging a Kara II Downfill Array with KARA-DOWNK1

K1 — Rigging a Kara II Downfill Array with KARA-DOWNK1

Connecting a ground-prepared Kara II downfill array to the bottom of a flown K1 array using the KARA-DOWNK1 interface. Reference: LA-K1-KARA-DOWNFILL-01. Follow in order — this is a sequential rigging procedure, not an independent checklist; steps depend on the ones before them.

  • Rigging accessory: KARA-DOWNK1.
  • Minimum 2 operators.
  • Up to 6 Kara II can be used in this downfill configuration.
  • Do not implement a pullback on a K1 array with a Kara II downfill.
  • Prerequisite: a K1 array is prepared and raised; an array of three Kara II with 0° inter-enclosure angles is prepared and positioned under the K1 array.

0/ complete

Not saved anywhere — resets when you leave this page.

Rigging a Kara II Downfill Array with KARA-DOWNK1

Source: L-Acoustics K1 Owner's Manual, EN, v4.0. Rigging procedures, pp.97-100.

KARA-DOWNK1 ledge orientation
FRONT (lower) REAR (higher) KARA II ARRAY

The ledge plate isn't symmetric — its rear edge sits higher than its front edge. Get the orientation backwards and the four rigging-arm slits won't line up with the Kara II array underneath.