PA Rigging / L-Acoustics / L2 / Flying with L2-BUMP and L2-BAR
L2 — Flying an Array L2-BUMP / L2-BAR
Flying an L2/L2D array under L2-BUMP, adding enclosures one at a time off their chariots using the automatic locking system. Reference: LA-L2-FLY-BUMP-01. Follow in order — this is a sequential rigging procedure, not an independent checklist; steps depend on the ones before them.
0/ complete
Not saved anywhere — resets when you leave this page.
Safety notes
- Minimum 2 operators. Rigging accessories: L2-BUMP, BPCHAIN 1.5T, 1 or 2 L2-BAR (optional), 2 Ø19 mm shackles WLL 3.25 t (+2 more if using a second L2-BAR).
- Risk of falling objects — verify no unattached items remain on the product or assembly.
- When flying an array, use the available holes to implement a secondary safety.
- Each enclosure locks with a "SHLAK!" click of its rigging arms — a visible yellow label on a latch means it is not fully engaged; do not proceed until it disappears.
Prerequisites
Attaching L2-BUMP to the Top Enclosure
Raising and Building the Array
Source: L-Acoustics L2 Owner's Manual, EN, v5.0. Rigging procedures, pp.97-106.