PA Rigging / L-Acoustics / K2 / Ground Stacking on K1-SB
K2 — Ground Stacking K1-SB
Stacking a K2 block on top of a K1-SB subwoofer stack via K2-BUMP. Reference: LA-K2-STACK-K1SB-01. Follow in order — this is a sequential rigging procedure, not an independent checklist; steps depend on the ones before them.
0/ complete
Not saved anywhere — resets when you leave this page.
Safety notes
- This procedure builds a K2 stack on top of a K1-SB subwoofer stack. Stacking the K1-SB portion itself is covered by the separate K1 rigging guides (K1-SB uses the same procedures as K1) — this guide starts once the K1-SB stack and K2-BUMP are already in place.
- K2-JACK stabilizers must not overlap the K2-CHARIOT wheel stops — this preserves K2-CHARIOT's ability to stack efficiently in storage.
Prerequisite: K1-SB Stack & K2-BUMP
Stacking K2 on the K2-BUMP
Optional: Stabilizing an Independent K2-CHARIOT Base
Only needed if the K2 block sits on its own K2-CHARIOT rather than directly on the K2-BUMP — omit this section otherwise.
Source: L-Acoustics K2 Owner's Manual, EN, v4.0. Rigging procedures, pp.67, 80-84, 118-119.