PA Rigging / L-Acoustics / Kara / Stacking Onto an SB18 Array (Rigging)

Kara — Stacked on SB18 Rigging

Stacking a 3-KARA array onto a platform-stacked or ground-stacked SB18 array, with optional angle arm extensions. Reference: LA-KARA-STACK-SB18-RIG-01. Follow in order — this is a sequential rigging procedure, not an independent checklist; steps depend on the ones before them.

Safety notes
  • This is the most safety-critical of the Kara stacking configurations.
  • Platform-stacked (on the M-BUMP/M-JACK platform): max 2 SB18 + 6 KARA.
  • Ground-stacked (directly on ground, no platform): requires a perfectly horizontal, regular surface, max 4 SB18 + 9 KARA.
  • The bottom KARA's angle is constrained by how many SB18/KARA are in the stack — e.g. 1 SB18 + 1-3 KARA allows −15° to +5°; 4 SB18 + 1-9 KARA allows −15° to +5° as well; 3 SB18 + 9 KARA narrows to −13° to +5°; 1 SB18 + 4 KARA narrows to −11° to +5°.
  • Always verify the specific count/angle combination against the manual's table or Soundvision before building.

0/ complete

Not saved anywhere — resets when you leave this page.

SB18 & Frame Setup

Loading the Array

Source: KARA Modular WST System, Rigging Procedures, v1.1 (L-Acoustics, distributed 2010-10-21), Section 6.4, pp.46-52.

M-BUMP-to-SB18 connecting arm
M-BUMP arm rotates out SB18

At each of the four points, the external arm on M-BUMP swings outward to reach the SB18 below, then a T-BLP pin locks it in place — repeat on all four connecting points before trusting the assembly.