PA Rigging / L-Acoustics / Kara / Platform-Stacking a Standalone Array (Rigging)

Kara — Platform Stack Rigging

Platform-stacking a standalone 3-KARA array on an M-BUMP/M-BAR/M-JACK ground platform, with optional angle arm extensions. Reference: LA-KARA-STACK-STD-RIG-01. Follow in order — this is a sequential rigging procedure, not an independent checklist; steps depend on the ones before them.

Safety notes
  • A platform-stacked array can nominally support up to 9 KARA enclosures.
  • M-BAR should be installed in rear-overhang configuration for a positive site angle, or front-overhang for a negative site angle.
  • Always level the stacking platform with an inclinometer before loading enclosures onto it.

0/ complete

Not saved anywhere — resets when you leave this page.

Platform Setup & Leveling

Optional Angle Extensions

Loading the Array

Source: KARA Modular WST System, Rigging Procedures, v1.1 (L-Acoustics, distributed 2010-10-21), Section 6.3, pp.35-41.

M-BUMP orientation
FLOWN ID PLATE readable, right-side up GROUND-STACKED ID PLATE upside down on purpose

Same M-BUMP, opposite orientation depending on the job — flown, the plate reads normally; ground-stacked, it mounts upside down. Both configurations still point the laser slits at the audience.