PA Rigging / D&B / V/Y Series / De-rigging Array (Subwoofers)

V/Y Series — De-rigging Subwoofers

Safely de-rigging a flown V-SUB or Y-SUB subwoofer array. Reference: VY-MAN-DERIG-SUB-01. Follow in order.

0/ complete

Not saved anywhere — resets when you leave this page.

Landing the Array

Frame Pack-down

Source: "De-rigging tutorial. V-SUB or Y-SUB" — the official tutorial demonstrating the exact mechanics of safely de-rigging flown V-Series and Y-Series subwoofer arrays.

The splay link moves for subs
FLYING FRAME TOPS position (default) SUBS position (used while rigged)

The splay link isn't fixed to the frame — it physically moves between mounting points. Once the subs are down, park it back at the tops/storage position rather than leaving it at the subs point.