PA Rigging / D&B / GSL/KSL Series / Overview & Rigging Accessories

GSL/KSL — Overview Rigging Accessories

Preparing the flying frame and rigging accessories before building an array — do this before any rigging-mode-specific procedure. Reference: GSL-MAN-OVERVIEW-01.

0/ complete

Not saved anywhere — resets when you leave this page.

Frame Preparation

Cabinet Connection & Transport

Source: "SL-Series tutorial. GSL/KSL 1. Overview and rigging accessories" — the official tutorial demonstrating the exact mechanics of preparing the flying frame and rigging accessories.

Load beam orientation
STANDARD LOAD BEAM FRAME down-tilt FRONT LOAD BEAM FRAME up-tilt

Same load beam, two mounting orientations on the frame — Standard gives you a down-tilted array, Front gives you up-tilt. Pick the orientation before connecting the first cabinet, not after.