Reference: LOAD-OUT-01. The moment gear comes off stage is exactly when it's most likely to walk off, get damaged in the rush, or go back in the case in the wrong state for next time. A planned teardown order fixes all three.
0/ complete
Not saved anywhere — resets when you leave this page.
See also the Power-Up / Power-Down Sequence Checklist for the electrical side of shutdown, and the existing Stock/Inventory List Calculator for tracking what's actually in the truck.
Power Down (Reverse Order)
Teardown Order
Equipment Security
Source: Boyce, Teddy. Live Sound Reinforcement, §15.2–15.4 "Power Down," "System Teardown," "Equipment Security." Rewritten in Ryan's own words from the source material.